From: route@monster.com
Sent: Friday, August 19, 2016 10:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Scott
Alan Weinholzer 5910
Ashmere Ln Spring,
TX 77379 Email:
sweinholzer@hotmail.com Contact
number: 713-344-5512 In my latest role I
was responsible for all Project Planning and Scheduling for the Rig
Engineering Team at BP America utilizing Oracle Primavera P6 in the Gulf of
Mexico Region. The role supports Offshore Drilling projects, Equipment
Maintenance, Recertification and Repair, new equipment installation and
facility Turnaround efforts. Coupled with over sixteen years of experience in
the Manufacturing and Production industry, to include Scheduling, Planning
and Materials Support, I am highly competent in the field of General
Operations, very detailed and committed to working with limited supervision
or as a member of a team. I am accustomed to working in pressure situations,
conscientious and accepting of ever evolving work environments and able to
multi-task effectively while managing several projects simultaneously. Employment History: February 2012 to
April 2016: BP America, Houston, Texas: Rig Engineering
Project Planner/Scheduler (Consultant) Develop and
maintain team project schedules for BP assets in the Gulf of Mexico thru P6. Coordinate Project
Execution Readiness with Activity Planning team and Rig Area schedulers. Comply with and schedule
projects to align with Activity Planning for Execution Gate Readiness. Create and update
planned versus actual progress curve layouts. Develop and
maintain team project schedules during TAR. Liaise with and or
visit supplier facilities for engineering and equipment updates. Travel offshore to
support project process and development. Interface with
Offshore/Onshore staff to support schedule project execution initiatives. Track project MOC
(Management of Change) orders thru close-out. Create and manage
team Sharepoint project folders. Manage and report
Project Execution Readiness/Offshore Execution KPI’s for Dashboard update. Provide ad-hoc
reports as required through MS Office suite software. *BP
Management references: Mark
Diehl, Rig Engineering Team Lead - #281-850-1550 - mark.diehl@bp.com Scott
Deans, GWO Performance Management - #512-789-9699 - scottc.deans@bp.com August 2008 to
January 2012: Forum Energy Technologies, Houston, Texas. November 2009 –
January 2012: Operations Supervisor Overall
responsibility for the Planning, Purchasing, Material Control,
Shipping/Receiving, Mechanical, Electronic and Quality Control departments at
the Houston Texas facility. Develop and
maintain overall Production schedule. Track and report on
delivery statistics. Forecast labor
requirements based on planned work load. Interview and
select Operations personnel. Oversee annual
year-end inventory audit. August 2008 –
October 2009: Manufacturing / Production Planner Scheduler Plan and Schedule
all projects related to Product Support sales orders, Major Spares, Subsea
Tooling builds, and product repair orders. Track all Purchase
Order due dates and deliveries for Production schedules and general sales
order deliverables. Contact suppliers
confirming delivery status and rectify potential material slip dates. Expedite urgent
material requirements. Communicate with
Program Management and Sales team regarding all orders. Investigate and
resolve any potential issues posing a threat to the schedule. October 2005 to
March 2008: Aquarius Water Conditioning, Inc. Little Canada, Minnesota. September 2006 –
March 2008: Inventory and Facility Manager Forecast all
equipment purchases based on consumer and economic trends. Purchase all
conditioning equipment inventory. Receive and stock
all conditioning units, parts, assembly components and chemicals. Stage equipment for
Installation associates based on daily work orders. Ensure conditioning
and plumbing consumable availability for service and installation. Material support
for three franchise satellite offices. October 2005 –
August 2006: Water Specialist
In house sales of
water conditioning equipment. Conduct onsite
chemical analysis. Determine and
propose equipment applications and solutions. Assist in equipment
installation as required. May 2005 to
September 2005: Polaris Industries, Inc. Osceola, Wisconsin. Materials Group
Leader Overall
responsibility of 11 Material Handlers. Maintain inventory
cycle count accuracy. Investigate and
resolve inventory discrepancies. Daily receipt of
goods both foreign and domestic. Direct the
distribution of parts to the specific production lines. November 1992 to
February 2005: Perry Slingsby Systems Inc. Jupiter, Florida. January 2002 –
February 2005: Product Support Planner Review Engineering
releases and production drawings for current revision. Create and maintain
production work orders, material pick lists and production schedules. Expedite all
materials and labor efforts as needed. Status and report
all Product Support material. Maintain company
safety stock levels. Identify, evaluate
and dispose of obsolete inventory. Assist in
Production Planning as required. Modify and update
procedures supporting best practice fit. May 1999 –
December 2001: Material, Customer Sales and Warranty Planner Create production
work orders and material picking lists. Maintain drawing
and work order Bill of Material accuracy. Oversee Material
Control, Shipping and Receiving departments and associated personnel. June 1998 –
April 1999: Program Manager/Coordinator Maintain project
cost reports within budget. Direct liaison to
project customer. Develop and
maintain production schedule for timely completion. Responsible for
meeting milestones, executing budgetary invoicing and change notices. January 1998 –
May 1998: Manufacturing/Planning Scheduler Track all inventory
material by work order requirements. Track work order
assemblies throughout manufacturing operations. Apply and maintain
milestone dates according to project completion schedule. Mediate material or
work order problems. Update and revise
work order sequences to maintain process efficiencies. November 1992 –
December 1997: Material Control and Receiving Supervisor Perform daily
inventory cycle counts. Rectify cycle count
discrepancies. Track allocated
material for work orders. Route Work In
Process kits and back order material to production floor. Issue, return, and
transfer projects parts as required. Overall direction
of personnel and activities assigned to Materials and Receiving Department. United States Navy 1984 – 1988
Honorable Discharge Rate: Radioman Held Top Secret
security clearance. Specialized in
Naval Communications for the US fleet and shore station commands globally. Performed
preventative maintenance associated with work space and shipboard equipment. *Ship/Base assignments: USS Lockwood FF-1064 – Yokosuka,
Japan COMSUBRON 7 (Commander Submarine
Squadron) – Yokosuka, Japan USS Cleveland LPD-7 – San Diego, CA COMSTA San Diego (Communications
Station) – San Diego, CA NAB Coronado (Naval Amphibious
Base) – Coronado Island, San Diego, CA Education: Ashworth College Current student –
Associate of Applied Science in Construction Management Oracle
Certifications Oracle
Primavera P6 Project Management - 8/16/2012 Oracle
Primavera P6 Professional Advanced Rel. 8.3 – 4/10/2015 MS
Office Suite Excel,
Word, Power Point, Visio, Project 2010 Safety and
Environmental Management Systems (SEMS) Compliance Transportation Worker
Identification Credential (TWIC) Water Survival / Helicopter
Underwater Escape Training (HUET) United States Passport - Current Additional
References provided upon request. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|